Where is the thunderhorse platform?
Mississippi Canyon
The Thunder Horse field is located in Mississippi Canyon Blocks 776, 777 and 778, in the Boarshead Basin, 125 miles south-east of New Orleans. It is one of the largest fields in the Gulf of Mexico and lies at a water depth of 6,000ft.
What is a PDQ platform?
334. Notes. Thunder Horse PDQ is a BP plc and ExxonMobil joint venture semi-submersible oil platform on location over the Mississippi Canyon Thunder Horse oil field (Block 778/822), in deepwater Gulf of Mexico, 150 miles (240 km) southeast of New Orleans, moored in waters of 1,840 metres (6,040 ft).
How big is thunderhorse?
Located 150 miles southeast of New Orleans and in 6,050 feet of water, Thunder Horse is designed to process up to 250,000 barrels of oil and 200 million cubic feet of natural gas per day.
How far offshore is Thunderhorse?
Thunder Horse oil field, located approximately 240km off the south-eastern coast of New Orleans, US, is one of the biggest producing fields in the deepwater Gulf of Mexico. The offshore field is operated by BP, which holds 75% equity interest, and the remaining 25% is owned by ExxonMobil.
Is PDQ deploy free?
PDQ Deploy free mode is 100% free to use in any setting (commercial, government, or education).
Where are the Baku oil fields?
Azeri (Azerbaijani: Azəri) is an offshore oil field in the Caspian Sea, located 100 km (62 mi) east of Baku, Azerbaijan and is a part of the larger Azeri-Chirag-Guneshli (ACG) project.
How deep is the Mississippi Canyon?
A series of successive failures, each one creating an upslope instability that triggered the next failure, caused an elongate trough to form that excavated the canyon to a depth of 1,220 m.
Which Guitar Hero is thunderhorse on?
Guitar Hero II
Thunderhorse is a song performed by the fictional band Dethklok, from the cartoon, Metalocalypse. The song is featured in Guitar Hero II as a purchasable song from the store.
What does BP company stand for?
The British Petroleum Company plc
BP plc (official styling BP p.l.c., formerly The British Petroleum Company plc and BP Amoco plc) is a British multinational oil and gas company headquartered in London, England.
How big is the BP Thunder Horse platform?
The BP Thunder Horse Production-Drilling-Quarters (PDQ) platform is a marvel of modern offshore engineering. With a displacement of 130,000t and a weight of 59,500t, it is the largest offshore semi-submersible installation of its kind in the world.
How big is Thunder Horse semi submersible platform?
The main power generation capability is 90MW.The PDQ platform has space to accommodate 229 people. Thunder Horse PDQ is one of the world’s biggest moored, steel production semi-submersibles ever built. The platform’s topside area is as big as three football fields.
Where was the ship Thunder Horse PDQ built?
Thunder Horse PDQ. The hull was built by Daewoo Shipbuilding & Marine Engineering (DSME) in Okpo, South Korea, then loaded aboard the heavy lift ship MV Blue Marlin and transported to Kiewit Offshore Services in Ingleside, Texas where it was integrated with its topsides modules that were built in Morgan City, La..
How big is the hull of Thunder Horse Field?
The hull, which weighs 60,000t and displaces 129,000t, consists of four columns, which are connected by 11.5m pontoons. A total of 330 blocks were required for the hull’s regular pontoons, as well as the four corner boxes.