What is the Gull Island project?

What is the Gull Island project?

The Gull Island hydroelectric project would include development of a 2,250 MW generation facility (approximately 2.7 times the capacity of Muskrat Falls) and associated transmission infrastructure required to deliver power to potential markets in Newfoundland and Labrador and/or beyond to external markets such as …

Who owns the Muskrat Falls project?

Nalcor Energy
Lower Churchill Project

Muskrat Falls Generation Facility
Construction began 2013
Opening date September 23, 2020
Construction cost $12.7 billion
Owner(s) Nalcor Energy

Who paid for Churchill Falls?

Hydro-Québec
The end result is that Hydro-Québec has agreed to pay the Churchill Falls Corporation a retroactive payment of almost $25 million. Hydro-Québec retains its annual energy entitlement. The initial contract was signed in 1969 and has since expired, but a renewed power contract, effective Sept.

What was the aim of the hydroelectric projects on the lower Churchill River?

Project details The LCP is intended to make use of the untapped hydroelectric potential of the Churchill River to meet future electricity needs. About 65% of the potential generating capacity of the river is being utilised by the 5,428MW Churchill Falls Generating Station, which was commissioned in 1971.

Is Muskrat Falls producing power?

First power from Muskrat Falls was achieved in September 2020. The first of four generating units was turned over to operations in December 2020. All four units are forecast to be in service in fall 2021.

Where is Gull Island in Lake St Clair?

Gull Island is at the mouth of the south channel of the St. Clair River. Jobbie Nooner is one of the parties that take place on Gull Island at Lake St. Clair Michigan twice every year.

Where does the power from Muskrat Falls go?

Surplus power to N.S. St. John’s, N.L.-based Nalcor, which owns Muskrat Falls, said electricity deemed surplus in Newfoundland is being sent across the Cabot Strait into Nova Scotia via the Maritime Link.

What is the Labrador Island Link?

The Labrador Island Link transmission project is a 350-kV HVDC line that will run 1,100 kilometers (683.5 miles) from the proposed hydro generating station at Muskrat Falls, Labrador, to Soldiers Pond, Newfoundland. The line includes a 30-km (18.6-mi) underwater segment beneath the Strait of Belle Isle.

Where does the power from Churchill Falls go?

The contract concerns the development and subsequent sale of electricity from the Churchill Falls hydro site, one of the world’s largest. Almost all the power must be sold to Hydro-Québec on a very long-term basis at an extremely low price.

How much power does Churchill Falls generate?

5,428 MW
The Churchill Falls Generating Station is a hydroelectric underground power station in Labrador. At 5,428 MW, it is the tenth largest in the world, and the second-largest in Canada, after the Robert-Bourassa generating station in northwestern Quebec.

Who benefits from the Muskrat Falls project?

Economic Benefits Total income to labour and business for Newfoundland and Labrador will be $1.4 billion or $220 million per year. Over $210 million in taxes will accrue to the Government of Newfoundland and Labrador. Canada-wide income to labour and business will be $3.5 billion or $540 million per year.

What are the advantages of Muskrat fall?

Is there a Gull Island project in Newfoundland?

Proposed Gull Island project, courtesy Nalcor. Don’t look now, but the top energy executive in the province sees a day in the not-too-distant future when Newfoundland and Labrador will be doing another hydro mega-project despite the disastrous Muskrat Falls.

How big is the Gull Island hydroelectric project?

There is growing concern that Nalcor intends to proceed with the 2,250 MW Gull Island Project. This project would be even larger than the Muskrat Falls project, and would involve far more flooding – 232 kilometers of reservoir—that is almost four times the size of the planned reservoir behind Muskrat Falls.

Why is there a rush to get Gull Island done?

Clearly, there is a rush to get the Gull Island project done, based on the argument that we are going to lose the human resources capital if we do not move fast. This is a frequent argument in engineering circles: that we need to get another project going before the people on the last project leave.

Is the Gull Island project a mitigation plan?

This is the province’s mitigation plan for recovering its economic losses from the Muskrat debacle– by selling electricity to the energy-hungry market in the United States. The proposed site of the Gull Island mega project. Photo: A. Lathem