What is the use of control key in SAP PP?

What is the use of control key in SAP PP?

Definition. The control key is a default value which defines how an operation should be processed. It is entered in the operation overview or on the detail screen for the operation. If a default value for the control key was specified in your system using the Customizing function, the system proposes this as the entry.

What is control key in work center?

Control key assigned in the work center determines usage of the work center in the type of production (In-house/External). When the work center is assigned in a routing, it takes the control key by default which is assigned in the work center data.

What are the available control key parameters in SAP PM?

We need to consider the most important parameters while creating a control key.

  • Capacity planning,
  • Costing.
  • external processing.
  • completion confirmation.

How do I create a control key in SAP?

Step 1: – Enter transaction code “OPSU” in the SAP command field and press enter. Step 2: – On activity control key screen, click on “New entries” to create new control keys as per requirements of a organization. Step 3: – On new entries activity control key screen, update the following fields.

What is confirmation control key in SAP?

The confirmation control key controls the process subsequent to the creation of the PO. The confirmation control key governs whether confirmations are expected for specific purchase order items and whether these confirmations are relevant for goods receipt or materials planning.

What is QM control key in SAP?

Ad. This key determines which conditions are valid for quality management in procurement. If you activate the indicator for QM in procurement in the material master record at the client level , you must also store a control key at the plant level for quality management in procurement.

What are routings in SAP?

A routing is a description of which operations or list of activities has to be carried out during the production and planning process. It also tells what order or sequence the activities/operations needs to be carried out at work centers or machines.

What is the difference between PM02 and PM03 control key?

PM02 : the sub-contracted activity is managed by means of a normal purchase requisition. PM03 : the sub-contracted activity is managed on the basis of the service master or conditions and imply then the seizure of the services (Plant maintenance -> Maintenance Processing -> Environment -> Service Master ).

What is PM01 and PM02 in SAP?

PM01 – Planned Corrective maintenance. PM02 – Breakdown maintenance (Urgent Unplanned Corrective) PM03 – Preventative maintenance. PM04 – Refurbishment maintenance.

What is standard value key in SAP PP?

When you assign a work center to an operation, up to six data fields and key words are assigned to the operation via the standard value key of the work center. The standard value key is defined in the Customizing for Work centers by choosing Standard value and is entered in the Basic data screen of the work center.

What is SAP CCK?

Confirmation Control key | SAP Community.

What is rough GR in SAP MM?

The rough goods receipt is a step that takes place before the actual goods receipt posting. The delivery is identified and the items on the delivery documents sent by the vendor are matched up with the order items in the system. The system compares the quantities ordered with those contained in the delivery papers.

What are the most important SAP pp interview questions?

100 Most important SAP PP Interview Questions. 100 Most important SAP PP Interview Questions. 1. What is MTS and MTO and the difference between them? 2. Different types of consumption based planning. 3. What is MPS and difference between MRP and MPS? 4. Explain the Difference between the Discreet and REM. 5. Difference between PP and PI. 6.

Why are control keys important in SAP pp?

Control keys are really important keys in SAP PP. A control key governs the following controls for a production order Routing: § Whether a work center at an operation should be scheduled. § Whether a work center at an operation should be subjected to cost derivations.

When to use control key in PP PI?

Control key is used to define whatever the business transactions should be performed. 1) Configuration path for PP PI: SPRO -> IMG ->Production planning for process industries -> Master data -> Resource -> Master Recipe data -> Define control keys.

Where do I Find my Control key in SAP?