What time does MRT open downtown line?

What time does MRT open downtown line?

The DOWNTOWN LINE metro (to ⑪ Bukit Panjang) has 34 stations departing from Expo (CG1|DT35) and ending in Bukit Panjang (BP6|DT1). DOWNTOWN LINE metro timetable overview: Normally starts operating at 05:36 and ends at 23:40. Normal operating days: everyday.

What time does the MRT start?

5.30am to around midnight
Train Operation Hours and Frequency 5.30am to around midnight daily. Operating hours are usually extended during festive periods.

Which is the deepest MRT station in Singapore?

Bencoolen Station
Bencoolen Station At 43 metres below ground, it is the deepest MRT station in Singapore. The station had to be constructed at such depth as existing infrastructures had to be taken into consideration including buildings on the street level, as well as the underground North-South Line (NSL) and CCL tunnels.

When was the Blue Line opened?

People love the train Between its June 2004 opening and December 2018, customers boarded the METRO Blue Line more than 141 million times. In 2018, Blue Line trains carried a record 11.1 million riders.

Is Jalan Besar MRT open?

Jalan Besar MRT station is an underground Mass Rapid Transit station on the Downtown Line in Rochor, Singapore. The station is located under Jalan Besar, at the junction with Weld Road, hence its name….DT22.

DT22 Jalan Besar 惹兰勿刹 ஜாலான் புசார் Jalan Besar
Disabled access Yes
History
Opened 21 October 2017
Electrified Yes

When is the new Downtown Line going to be built?

Construction works for the new station began on 28 February 2021 and the new station is expected to be completed by 2025. Announced in the Land Transport Master Plan 2040 on 25 May 2019, the Downtown Line will be extended northwards to connect with the North-South Line at the new Sungei Kadut station.

How long is the Downtown Line in Singapore?

The Downtown Line 1 was originally announced on 14 June 2005 as a 3.4km Circle Line extension from Promenade to Chinatown stations. Stage 2 of the Downtown Line (then Bukit Timah Line) was designed as a 20km connection from the Bukit Timah corridor to the downtown.

Which is the stage 3 extension of the Downtown Line?

The artworks for Beauty World, Jalan Besar and Expo stations are selected through the Downtown Line Art in Transit competition. Stage 3 Extension: DT36 Xilin and DT37 Sungei Bedok stations are currently not in operation. DT4 Hume station is currently not in operation. Loading… Javascript is required for this section to function correctly.

When did the first station on the Downtown Line open?

Constructions for the 4.3km Downtown Line 1 started on 12 February 2008 and consists of six stations from Bugis to Chinatown. The first phase of the line opened on 22 December 2013, allowing commuters to conveniently travel within the city area.