What is Tepco Fukushima?

What is Tepco Fukushima?

The Fukushima Daiichi Nuclear Power Station, site of the accident of March 11, 2011. TEPCO is committed to carrying out the complex, multilayer and large-scale project, which will take 30 to 40 years, safely and surely.

Is the Fukushima plant still operating?

The sister nuclear plant Fukushima Daini (“number two”), 12 km (7.5 mi) to the south, is also run by TEPCO….

Fukushima Daiichi Nuclear Power Plant
Status Being decommissioned
Construction began July 25, 1967
Commission date March 26, 1971
Decommission date December 2021

Who owns Fukushima nuclear plant?

Tokyo Electric Power Company
In total, the station has six boiling water reactors which together have a power generation capacity of 4.69GW. Fukushima Dai-Ichi was the first nuclear plant to be constructed and operated entirely by Tokyo Electric Power Company (TEPCO).

Where is the Fukushima nuclear power plant located?

The Fukushima Daiichi Nuclear Power Plant is in the town of Okuma, in Fukushima Prefecture. It sits on the country’s east coast, about 220km (137 miles) north-east of the capital Tokyo.

Who owns Tepco?

Nuclear Damage Compensation And Decommissioning Facilitation Corporation
Tokyo Electric Power Company/Parent organizations

Can you visit Fukushima power plant?

The no-entry zone around the nuclear plant makes up less than 3% of the prefecture’s area, and even inside most of the no-entry zone, radiation levels have declined far below the levels that airplane passengers are exposed to at cruising altitude. Needless to say, Fukushima is perfectly safe for tourists to visit.

Why did Tepco get fined?

Japan’s Fukushima Nuclear Power Plant Operators Penalized for Sloppy Safeguards at Niigata. The Tokyo Electric Power Company (TEPCO) nuclear power plant in Niigata is facing a temporary suspension due to lax anti-terrorism equipment and the insufficient protection of nuclear materials.

How tall was the Daiichi nuclear power plant?

The original design basis tsunami height was 3.1 m for Daiichi based on assessment of the 1960 Chile tsunami and so the plant had been built about 10 metres above sea level with the seawater pumps 4 m above sea level. The Daini plant was built 13 metres above sea level.

Where are the nuclear power plants in Japan?

The Fukushima Daini Nuclear Power Plant (福島第二原子力発電所, Fukushima Daini (pronunciation) Genshiryoku Hatsudensho, Fukushima II NPP, 2F), is a nuclear power plant located on a 150 ha (370-acre) site in the town of Naraha and Tomioka in the Futaba District of Fukushima Prefecture, Japan. The Tokyo Electric Power Company (TEPCO) runs the plant.

How long does it take to decommission a nuclear power plant?

In an outline plan, Tepco said that decommissioning of nuclear power plants usually takes about 30 years to complete. “However, as the decommissioning of Fukushima Daiichi will be implemented at the same time, the allocation of human resources must be thoroughly considered,” it added.

How does the Shin-Iwaki substation connect to the nuclear power plant?

The Shin-Fukushima substation also connects to the Fukushima Daini plant by the Tomioka Line (富岡線). Its major connection to the north is the Iwaki Line (いわき幹線), which is owned by Tohoku Electric Power. It has two connections to the south-west that connect it to the Shin-Iwaki substation (新いわき).

Begin typing your search term above and press enter to search. Press ESC to cancel.

Back To Top