Where does the WestConnex start and finish?
Concord Interchange The configuration of the new Concord Road interchange has resulted in around 7,400sq m of new public open space, designed in consultation with the local community.
Where does the M8 tunnel start and finish?
The M8 runs from the King Georges Road Interchange at Beverly Hills to a new interchange at St Peters (built on the former Alexandria landfill site).
Why is WestConnex being built?
improving north-south travel times for public buses accessing the Western Rail Line at Burwood and other stations. delivering more than $20 billion in economic benefits to NSW.
Who owns WestConnex?
Transurban
Transurban, as part of the Sydney Transport Partners consortium, has successfully been awarded 100% ownership of WestConnex, Australia’s largest road infrastructure project.
What is the point of WestConnex?
WestConnex is more than a motorway. It is a scheme designed to act as a catalyst to renew and transform the parts of Sydney through which it passes. WestConnex creates opportunities for urban renewal and public transport improvements, especially along Parramatta Road.
How long is WestConnex M4?
33 km
WestConnex
WestConnex New South Wales | |
---|---|
Type | Motorway (Under construction) |
Length | 33 km (21 mi) |
Opened | 20 December 2016: King Georges Road interchange upgrade 15 July 2017: M4 widening 13 July 2019: M4 East 5 July 2020: M8 Motorway 2023: M4–M5 Link main tunnels, Rozelle Interchange, Iron Cove Link |
Major junctions |
Where is the WestConnex tunnel?
Sydney
WestConnex is a 33-kilometre (21 mi) predominantly underground motorway scheme in Sydney, New South Wales, Australia. As of 2021, it is partially completed and partially still under construction.
How deep is M8 tunnel?
The nine-kilometre M8 tunnel links Kingsgrove and St Peters, burrowing up to 90 metres deep below Sydney’s southern suburbs. It opens early Sunday morning and will cost motorists a maximum of $6.95.
What are the disadvantages of WestConnex?
WestConnex: Drawbacks and Alternatives
- The first disadvantage is cost.
- The second disadvantage is traffic growth.
- Other areas of disadvantage include the social and environmental impacts from an increase in car dependency.
What is the aim of WestConnex?
WestConnex is one of the NSW government’s key infrastructure projects. It aims to ease congestion, create jobs and connect communities, and is the largest integrated transport project in Australia.
How much is WestConnex worth?
Transurban is increasing its stake in Sydney’s largest road project – but at what price. WestConnex is gargantuan: a 33km mostly underground road in Sydney’s inner west. Including debt, WestConnex is worth around $33bn, making it one of Australia’s largest assets and a similar size to Sydney Airport.
Is WestConnex complete?
WestConnex is a 33-kilometre (21 mi) predominantly underground motorway scheme in Sydney, New South Wales, Australia. As of 2021, it is partially completed and partially still under construction.
How big is the WestConnex motorway in Australia?
WestConnex is a 33-kilometre (21 mi) predominantly underground motorway scheme in Sydney, New South Wales, Australia. As of 2021, it is partially completed and partially still under construction.
Where are the WestConnex tunnels on the M4?
WestConnex M4 (the New M4 Tunnels and the Widened M4), includes 5.5km tunnels and around 7.5km of surface roads. The WestConnex M4 links to the M4 at Parramatta in the west, and Wattle Street and Parramatta Road at Haberfield to the east.
Where is the interchange for the WestConnex in Sydney?
The St Peters Interchange, located at the eastern end of the M8, is a viaduct road interchange that connects the WestConnex with local arterial roads such as Euston Road and Gardeners Road. It will also connect to the proposed Sydney Gateway towards Sydney Airport. Recreational spaces are provided surrounding the interchange.
Is there a toll on the WestConnex motorway?
WestConnex has a distance-based tolling system which means motorists only pay for the section of motorway they use. When WestConnex is complete, the toll will be capped after 16km.