What number do you call for road conditions in Missouri?
If you know of a road or spot that needs work, please let us know. For Stormwater concerns, please visit our Report A Stormwater Concern page. For Emergency concerns (especially signals on flash or dark and downed stop signs) please contact us immediately at: 1-888-275-6636.
How often does MoDOT update?
every 10 minutes
Radar images supplied by the National Weather Service are updated every 10 minutes, so travelers can keep an eye on continuously changing weather conditions and plan their trips accordingly. Information is updated continuously throughout snow and ice events.
Is 270 closed in Missouri?
I-270, St. Louis County, one lane of Dunn Road at Washington/Elizabeth to Hanley/Graham closed until fall. I-270, St. Louis County, eastbound and westbound Pershall Road is closed at Coldwater Creek until 2022.
How many MoDOT employees are there?
MoDOT employs 2,400 maintenance employees statewide to maintain its 33,891 miles of state routes.
What does the Missouri Department of Transportation do?
MoDOT helps develop and improve airports, rail facilities, waterways, transit, bicycle, and pedestrian facilities statewide. Decisions are made concerning highway location, design, construction, and maintenance.
Is 270 an interstate highway?
Interstate 270 is the designation for four Interstate Highways in the United States, all of which are related to Interstate 70: Interstate 270 (Maryland), a connector to the Washington, D.C. metropolitan area. Interstate 270 (Ohio), a beltway around Columbus, Ohio.
Is 255 Open in St Louis?
ST. The project, which closed all of I-255 between 55/70 and I-64, was originally expected to be complete in February 2021. IDOT has announced the south section reopened on Saturday, Oct.
How many miles of roads does Missouri have?
The citizens of Missouri own a tremendous asset – the state transportation system. A significant component of the state system is the 33,832 miles of roads and 10,397 bridges, both of which rank among the largest for any state in the nation.
When are highway workers present on a Missouri roadway?
Proposed Rule reports and Executive Order summaries. Any time highway workers are present on a Missouri roadway – whether it’s a long term lane closure, a moving operation, or shoulder work – your safety and the safety of those workers depends on driver…
When does the Missouri transportation plan come out?
The 2022-2026 Statewide Transportation Improvement Program (STIP) lists transportation projects planned by state and regional planning agencies for fiscal years 2022 through 2026 (July 1, 2021 – June 30, 2026). The citizens of Missouri own a tremendous asset – the state transportation system.
What makes MoDOT such a good transportation system?
MoDOT has made great strides to build a good transportation system and increase taxpayers’ trust in its ability to deliver what was promised. Innovative concepts, such as Practical Designand design-bu…