What does KPE stand for Singapore?
Highway system. Expressways of Singapore. The Kallang–Paya Lebar Expressway (KPE) is the third newest of Singapore’s network of expressways. The southern (Kallang) section of the expressway opened first, on 26 October 2007, with the remaining (Paya Lebar) section opened on 20 September 2008.
How many exits are in KPE?
The new road system includes eight interchanges, 11 entry slip roads and 12 exit slip roads.
What is KPE?
Definition. KPE. K Pocket Environment. KPE. Kallang-Paya Lebar Expressway (Singapore)
When was KPE built?
2007
Kallang-Paya Lebar Expressway/Constructed
How long is KPE tunnel?
9-kilometre-
Stretching 12 km from East Coast Parkway (ECP) to Tampines Expressway (TPE),2 it includes a 9-kilometre-long tunnel, which was the longest underground road in Southeast Asia when it was completed in 2008.
Which is the longest expressway in Singapore?
The Pan Island Expressway
The Pan Island Expressway is the oldest and longest expressway in Singapore. Also, it is Singapore’s longest road. The expressway runs from the East Coast Parkway near Changi Airport in the east to Tuas in the west and has a total length of 42.8 kilometres.
Where are the emergency exit doors located in the KPE tunnel Kallang Paya Lebar expressway )?
Located every 100 metres next to the fast lane (extreme right lane), these exits lead to the opposite bound tunnel. These exits can only be found in the CTE, KPE and MCE tunnels.
How long is KPE MCE tunnel?
First, together with the Kallang-Paya Lebar Expressway (KPE), which opened in 2008, the KPE-MCE will have a total continuous underground length of more than 12 kilometres, making it the longest underground expressway in Southeast Asia.
What is the longest road in Singapore?
What is longest tunnel in the world?
The Gotthard Base Tunnel
The Gotthard Base Tunnel is the world’s longest and deepest tunnel. It runs under the Swiss alps between the towns of Erstfeld in the north and Bodio in the south. The tunnel is 57 km long and reaches a depth of 2,300 meters.
Which is the first lane in Singapore?
Usually 1st lane is used for overtaking and emergency vehicles. But it’s recommended for the vans/commercial vehicles to use 3rd lane or in other cases, 2nd lane as long as they don’t hog the traffic.
Where are the emergency exit doors located in the KPE tunnel?
Emergency exits in tunnels For CTE, KPE, MCE tunnels and Sentosa Gateway Tunnel, head for the emergency escape staircase, located every 500m in the tunnel next to the left-most lane.
How many planning areas are there in Singapore?
Indicative polygon of planning area boundary for Singapore Census of Population 2010. There are a total of 55 Planning Areas in Singapore with each Planning Area having a population of about 150,000 and served by a town centre and several neighbourhood commercial/shopping centres.
Where are the West regions of Singapore located?
The West Region consists of the following areas: 1 Bukit Batok 2 Bukit Panjang 3 Boon Lay 4 Pioneer 5 Choa Chu Kang 6 Clementi 7 Jurong East 8 Jurong West 9 Tengah 10 Tuas
When did the south end of the KPE open?
In all, the dual-carriageway expressway with three lanes in each direction will have eight interchanges, eleven on-ramps, and twelve off-ramps. The south end of the KPE also connects directly to the Marina Coastal Expressway which opened on 29 December 2013.
What are the 5 core regions of Singapore?
The Core Central Region comprises of the following areas: 1 Downtown Core (Marina Bay, Marina Centre, Raffles Place, Tanjong Pagar) 2 Outram 3 Sentosa 4 Rochor 5 Orchard 6 Newton 7 River Valley 8 Bukit Timah 9 Holland Road 10 Tanglin