How much does a concrete bull float cost?
Average costs: You’ll pay about $100 to $125 for a 4-foot magnesium bull float with bracket, and $18 for a 14-inch magnesium hand float.
Can you finish concrete without a bull float?
A bull float is used to level and smooth freshly poured concrete. Concrete used for visible projects, such as driveways, patios and sidewalks, often requires finishing. A bull float is a tool used for finishing concrete.
Do you need a float for concrete?
Float the concrete when you’re done grooving and edging (Photo 6). Floating removes the marks left by edging and brings the surface one step closer to a final finish. You may have to bear down on the float if the concrete is starting to harden.
How long do you wait to float concrete?
Allow all of the water to disappear before you do anything else. This can take 20 minutes or 4 hours depending on the temperature, humidity and how hard the wind is blowing. After the bleed water is all gone, you can get out your steel finishing trowel and put on the final touches.
What is the purpose of troweling concrete?
With every concrete pour troweling is important, because it allows the concrete to continue the process of finishing the concrete and squeezing residual water out of the concrete. Removing any excess water out of the concrete decreases the chances of the concrete cracking.
What can I use instead of a bull float?
Fresnos are used for troweling slabs that do not require a hard trowel surface. A Fresnos will speed up the troweling process. Fresnos should not be used as bull floats. Troweling can also be accomplished by machine.
How many times do you float concrete?
Push the bull float in one direction only across the concrete, keeping its front edge slightly above the surface by raising or lowering the handle. Two or three times is enough. Don’t overwork the concrete or you’ll weaken it by drawing too much sand and cement to the surface.
When should you Powerfloat?
A useful guideline to know when you can start up your trowel, is when the operator can stand on the concrete surface, and leave footprints about 1/8”-1/4” in depth and you can walk on it firmly without the top layer sticking to your boots it is ready to power float.
What happens if you dont trowel concrete?
If you haven’t done this before or only done it, a few times you are likely to make two mistakes; troweling too soon and troweling too much. Both of these have the effect of pulling fines and water to the surface. This can lead to a weakened surface, tiny cracks, and a white dusty surface.
Can I pour concrete over 2 days?
If you expect to pour concrete and use it in a couple days, you can’t. Protect new concrete from the cold for the first two to three days—up to a week, if it’s very cold—after which it should be strong enough to handle it without risk of damage.
Where can I hire a float for concrete?
Smooth wet concrete with ease using floats, available to hire from Jewson. We offer power floats, as well as easy float options to suit projects of any size.
Can you hire a bull float at Coates Hire?
Hire concrete bull floats from Coates Hire! This simple and convenient hand-tool is used widely in the construction industry. A bull float is a concreters essential, and can be easily and effectively used by almost anyone.
Why do you need a bull float for concrete?
Bull floating is performed on freshly poured and screeded concrete. A long handled concrete bull float eliminates awkward stretching. A concrete bull float with telescopic handle or extension poles allows the user to get the levels right for superior flooring or paving.
What kind of float do you need for a concrete slab?
Our 900mm power float is a heavy duty piece of concrete finishing equipment, designed for giving larger concrete slabs a smooth and level finish, when a manual float would be slow and inconvenient. You can book a concrete float hire online using our website.