How can I get summer training in NTPC?
As NTPC does not provide online application form, so interested students should have to send their resume to regional HR manager NTPC. HR is the only responsible person for trainee selection procedure. Student should contact placement cell of their college/institution and try to convince them to offer training letter.
What is NTPC training?
NTPC’s training policy envisages minimum 7 man days of training per employee per year. Our philosophy is to develop our own training systems and deliver training internally as far as possible. Hence, NTPC has developed its own training infrastructure, which comprises of –
What is the difference between internship and vocational training?
When training and internship are compared, it is noteworthy that, Objectives of training are rather work oriented. It focuses on learning new skills directly applicable in working situations for career development. Internship, on the other hand, is designed to gain practical experience than learning new skills.
Which is the third NTPC project in Singrauli region?
Rihand Super Thermal Power Project (RhSTPP) is located in the District of Sonebhadra in the state of Uttar Pradesh and 225 KM from Varanasi and is the third NTPC project in the Singrauli region.
What are the requirements for a summer internship in NTPC?
There is no predefined criteria about internship in NTPC. You must have completed 3rd year of B. Tech. degree program. NTPC never publishes any notification about summer internship schedule so you have to approach HR or management team at any NTPC branch. Eligibility Criteria for Internship in NTPC:
Which is the thermal power project of NTPC?
Vindhyachal Super Thermal Power Project of NTPC is located in the district of Sidhi/ Singrauli in the State of Madhya Pradesh.
Which is the thermal power station in Singrauli?
Singrauli Super Thermal Power Station (SSTPS) This power station was set up in 1977. It is a pit head Thermal Power Station having an installed capacity of 2000 MW with five units of 200 MW each and two units of 500 MW each. Water supply for the purpose is drawn from the Rihand reservoir.