Is renovation work allowed on Saturday?
i) Noisy renovation such as demolition of walls, removing wall/floor finishes, cutting of tiles and drilling works, etc. are restricted from 9.00 am to 5.00 pm daily during weekdays. j) Noisy renovation are not allowed to be carried out on Saturdays, Sundays and Public Holidays.
How do I complain about a renovation noise?
Residents who encounter renovation contractors who do not comply with the requirements can report them to the HDB via our Branch Service Line on 1800-225-5432 or the Essential Maintenance Service Unit after office hours. The HDB will investigate and take necessary action against the errant renovation contractors.
What time is renovation allowed in Singapore?
between 9:00am and 6:00pm
General renovation should only be carried out between 9:00am and 6:00pm on weekdays and Saturdays. No renovations are allowed on Sundays and public holidays. Noisy renovations within the flat such as demolishing of walls, removing wall/ floor finishes, cutting of tiles and heavy and excessive drilling works, etc.
Can I renovate BTO toilet?
All new HDB flats have a 3 year restriction period for wall and floor finishes removal in bathrooms and toilets. Even with these restrictions in place, you can still replace the ugly looking wall and floor tiles by overlaying them with tiles of your choice.
How do I check my HDB renovation permit?
Login to My HDBPage under ‘My Flat > Purchased Flat > Renovation’, to view your renovation permit once it has been granted.
Do I need permit for kitchen renovation?
Oftentimes, homeowners are surprised to learn that their full interior kitchen renovations require permitting, especially if they are doing something seemingly simple. However, the vast majority of kitchen renovations require not one, but three types of permits: building, electrical, and mechanical permits.
How do I inform the Neighbours of renovations?
You or your renovation contractor should: Inform your neighbours staying within a radius of 2 units at least 5 days in advance before renovations begin with written notice. Do remind your contractor to put up the Notice of Renovation outside your flat early and throughout the renovation period.
Is renovation allowed now?
“In Phase One, all types of house renovation works are allowed. He also stated that for construction of new houses under phases One and Two of the NRP, all construction sites which provide accommodation for their workers are allowed to operate. “Of course, the accommodation must be approved by the local councils.
Can I renovate my HDB?
Any renovation works you have planned for must be completed within 1 month for existing blocks and 3 months for newly completed blocks, from the date the renovation permit is granted. Please immediately inform the HDB Branch managing your flat immediately once your renovations are completed.
How long does it take to renovate HDB toilet?
Plan for 5 weeks at least The prep work and sourcing of materials along with hacking, haulage and tiling takes 2 weeks. Add to this, the time taken for carpentry. This could take anything between 1 to 3 weeks. So an average HDB toilet renovation takes 4 weeks, 5 if you want to be on the safe side.
Can HDB have bathtub?
Answer: Yes, it’s feasible to have a bathtub in an HDB flat, provided that you have enough space and budget.
What constitutes a renovation?
Renovation means “restore to a good state of repair.” In other words, dilapidated buildings or poorly maintained houses are sometimes considered to be in a state of disrepair. Remember construction involving renovation often refers to “restoring” or “repairing” an existing structure, replacing the old with the new.
Are there any restrictions on renovation of HDB flats?
Different types of HDB flats have different guidelines too. For example, if you own a DBSS unit, each DBSS development has its own guidelines. If your unit is an HDB-designed BTO, you can check on the renovation restrictions by using HDB’s portal.
Do you need a HDB permit to renovate your home?
While we’re sure you’re eager to begin renovating your home, you can’t just hire an interior designer or renovation contractor to start hacking away at your walls. There are HDB renovation permits and guidelines that need to be obtained and observed before works can commence.
What to do if your flat has been repaired by HDB?
In the event that HDB or the managing Town Council carries out any repair to your flat, you shall remove any renovation works and/ or fittings/ fixtures, to facilitate the repair work and reinstate them if necessary at your own expense. HDB regulates the types of renovations carried out in HDB flats.
Are there guidelines for design, build and sell flats?
Design, Build and Sell Scheme (DBSS) flats tend to have specific renovation guidelines as they are designed by different private developers. Take note of these guidelines when planning the renovations of your DBSS flat.