What is a nationwide 404 permit?

What is a nationwide 404 permit?

Under Section 404(e) of the Clean Water Act, the U.S. Army Corps of Engineers (Corps) can issue general permits to authorize activities that have minimal individual and cumulative adverse environmental effects. General permits can be issued for a period of no more than five years.

What are Usace nationwide permits?

Permits issued by the U.S. Army Corps of Engineers (the Corps) authorize various types of development projects in wetlands and other waters of the United States. Nationwide permits are one type of general permit. Nationwide permits, which number 52, are issued for five-year periods and thereafter must be renewed.

What is a PCN Usace?

The PCN is a combined effort by the US Army Corps of Engineers (USACE- known as the “Corps”) and the NC Division of Water Quality (DWQ) to coordinate regulatory requirements for work in (or affecting) wetlands, streams, riparian buffers, and waters within North Carolina.

What NWP 12?

The existing NWP 12 authorizes eligible discharges of dredged or fill material into waters of the United States in connection with the construction, maintenance, repair, and removal of utility lines, including oil and gas pipelines, water and sewer pipes, and electric, internet, and cable lines.

What is the 404 program?

Overview. Section 404 of the Clean Water Act (CWA) establishes a program to regulate the discharge of dredged or fill material into waters of the United States, including wetlands.

What is a 401 404 permit?

Wetlands, streams, lakes, ponds and other waters are regulated by state and federal law, and permits are required to impact these water bodies. Obtaining state and federal wetland permits can be a time-consuming process that can take up to a year.

What is a Usace pre construction notification?

408 because it will alter or temporarily or permanently occupy or use a U.S. Army Corps of Engineers federally authorized civil works project, the pre-construction notification must include a statement confirming that the project proponent has submitted a written request for section 408 permission from the Corps office …

What is a 404 wash?

Overview. Section 404 of the Clean Water Act (CWA) establishes a program to regulate the discharge of dredged or fill material into waters of the United States, including wetlands. Proposed activities are regulated through a permit review process.

What agencies have authority for CWA section 404?

While EPA administers the bulk of the CWA, the Corps is responsible for implementing the section 404 permitting program. However, EPA retains some authority to oversee and regulate certain aspects of the program. The following is a general overview of each agency’s responsibilities under section 404 of the CWA.

Who issues permits under Clean Water Act?

(a) The Secretary may issue permits, after notice and opportunity for public hearings for the discharge of dredged or fill material into the navigable waters at specified disposal sites.

What is pre construction notification?

The PCN – Pre-Construction Notification form is required for applicants seeking the following approvals from the US Army Corps of Engineers (USACE- known as the “Corps”) and the NC Division of Water Resources (DWR): Corps 404 or Section 10 Permit, or DWR 401 Certification, Buffer Authorization, Isolated/non-404 …

What do you need to know about Section 404 permitting?

Overview. Section 404 of the Clean Water Act (CWA) establishes a program to regulate the discharge of dredged or fill material into waters of the United States,including wetlands.

  • Agency Roles and Responsibilities. The roles and responsibilities of the Federal resource agencies differ in scope.
  • Additional Section 404 Information
  • Do I need a 404 permit?

    You do not generally need a permit under Section 404 if your discharges of dredged or fill material are associated with normal farming, ranching, or silviculture activities such as plowing, cultivating, minor drainage, and harvesting for the production of food, fiber, and forest products or upland soil and water conservation practices.

    What is a nationwide permit?

    A nationwide permit is a general permit that authorizes activities across the country, unless a district or division commander revokes the nationwide permit in a state or other geographic region. Nationwide permits authorize a wide variety of activities such as mooring buoys,…

    What is Section 401 permit?

    A Section 401 WQC is a required component of a federal permit and must be issued before a federal permit or license can be granted. The bulk of federal permits requiring Section 401 Water Quality Certification from IDEM are Section 404 Dredge and Fill Permits, which are issued by the U.S. Army Corps of Engineers (Corps).