What is induction in mining?
Mining induction is a pre-requisite for almost all employment within Australia`s mining industry, and particularly on site.� Because mining companies invest a great deal of time and money in their operations, they want to ensure that each one runs as smoothly as possible.� That means emphasising safety as well as …
What do they mine at Callide?
Description: Callide is an open cut mining operation providing low sulphur, sub-bituminous thermal coal primarily for Queensland’s domestic power generation. Coal Production and Resources: Coal reserves at Callide mine are estimated at approximately 225 Mt. Annual production is 10 Mt of saleable coal.
When did Callide mine start?
1944
Mining commenced at the Callide mine in 1944. Callide mine is an open cut operation with four distinct ‘pits’ in which mining takes place: Dunn Creek, Trap Gully, The Hut and Boundary Hill.
Who owns Callide coal mine?
Callide A and B are 100% owned by CS Energy Ltd. Callide C is a 50/50 joint venture between CS Energy and InterGen.
What should be included in a safety induction?
The induction must cover:
- hazards and risks in your workplace.
- special equipment, such as personal protective equipment, which may require additional training.
- safe work practices.
- work health and safety legislation.
- emergency procedures: emergency exits.
- first aid and other emergency contacts.
What should the site specific induction cover?
Site induction templates should include;
- Competencies and qualifications of inductees.
- Procedures for reporting incidents, injuries, and hazards.
- Workplace safety rules.
- Induction using safe work method statement.
- Training on use of specialised equipment.
- Do people have the right Personal Protective Equipment for their jobs.
What is mined at Biloela?
In addition to coal mining, the Queensland Nitrate Plant, coal seam gas, Queensland cotton gin and Grain Corp provide additional opportunities for employment and are attractions in their own right. The name Biloela is believed to come from an Aboriginal word meaning ‘white cockatoo’.
How does Callide power work?
Callide Power Station uses coal-fired power generation to supply baseload electricity to the national grid via its two sites: Callide B and Callide C. The 700 megawatt Callide B Power Station was commissioned in 1988 and since then has continued to supply electricity to our national market.
Is Callide Power Station Nuclear?
Callide Power Station is located near Biloela, in Central Queensland, Australia. It is coal powered with eight steam turbines with a combined generation capacity of 1,720 megawatts (MW) of electricity. The coal for Callide comes from the nearby Callide Coalfields and water from the Awoonga dam and Stag Creek Pipeline.
What are 3 main types of induction training?
What Are The 3 Main Types Of Induction Training?
- Pre-Induction: information provided prior to the new employee starting work.
- Induction: The first day and subsequent transition into the workplace.
- Post-Induction: follow-up and adjustment after the new role has started.
What are safety inductions?
A safety induction is the first step to engaging your contractors, employees and visitors regarding working safely on site, in the workplace. A good safety induction will provide the groundwork and foundations for working safely in the organisation, protecting both the employee and their coworkers.
What are site inductions?
Site induction is the process of ensuring workers on construction sites are fully informed about the organisation and operation of the site and of their responsibilities. It focuses in particular on safety aspects of the site.
Do you have to do an induction at Callide mine?
Visitor Induction. All visitors to Callide Mine are required to complete an induction before visiting the site. To save time on arrival please complete the online induction. If you are unable to complete the visitor induction online please allow sufficient time (Approx 20 min) when arriving on site. Please print your induction slip.
When did mining start at the Callide mine?
Mining commenced at the Callide mine in 1944. Callide mine is an open cut operation with four distinct ‘pits’ in which mining takes place: Dunn Creek, Trap Gully, The Hut and Boundary Hill.
When was Callide C coal fired power station commissioned?
In 2001 Callide C Power Station was commissioned, which CS Energy owns Callide C in a 50/50 joint venture with InterGen. Callide C was the first supercritical coal-fired power station in Australia and has a capacity of 825 MW.
Is the Callide coal mine safe to work at?
Callide Coal Mine is committed to safe and environmentally responsible operations and supporting the local communities that it has partnered with for more than 70 years.