What is an AIA A201?

What is an AIA A201?

Conventional (A201) is the most commonly used family of AIA Contract Documents because the documents are suitable for the conventional delivery approach of design-bid-build. These documents can be used on small to large projects. …

What is the A201 document for?

Purpose. AIA Document A201–2017, General Conditions of the Contract for Construction, is considered the keystone document of the Conventional family of documents because it provides the terms and conditions under which the Owner, Contractor, and Architect will work together during the building construction process.

Where is force majeure in AIA contracts?

AIA A201 Paragraph 8.3 is the force majeure clause only without naming it as such. You’d find similar wording in other agreements that actually use the term.

How do AIA documents work?

AIA Contract Documents is an online document automation service that allows you to manage your project data and generate contract documents. You can access your projects and documents anytime and from anywhere using your favorite browser (Internet Explorer, Firefox, Chrome or Safari) for the PC or the Mac.

What is AIA E203?

AIA Document E203–2013 is not a stand-alone document but is intended to be attached as an exhibit to an existing agreement for design services or construction on a project where the parties intend to utilize Digital Data and/or Building Information Modeling.

What is a G702 form?

The AIA G702 serves as both the contractor’s application and the architect’s certification. Its use can expedite payment and reduce the possibility of error. This document is often referred to an AIA billing form, progress billing form, payment app, or pay app.

How do I claim force majeure?

A contract party asserting force majeure must establish a causal link between the relevant event and the party’s inability to perform. For example, the current and evolving restrictions designed to prevent the spread of COVID-19 may make it impossible to timely perform under the contract.

Does force majeure excuse payment obligations?

Also note that most force majeure clauses do not excuse payment obligations, which includes payment of rent, operating expenses and loan payments. You should also review carefully whether performance is excused or suspended or evaluate what is excused or suspended.

How do I finalize an AIA Document?

To finalize an offline draft from the Projects tab::

  1. Go to the Projects tab.
  2. Click Import File.
  3. Click Choose File(s).
  4. Select your AIA document draft(s) from your computer and click Import.
  5. Click Finalize to the right of the imported draft title.

What does AIA document mean?

An AIA is a document that contains completed contract billing throughout the project; this document was created mainly to assist architects working on a construction project to be paid for the work completed on the project.

What is an E203 2013?

What is AIA G702 and G703?

AIA Document G702®–1992, Application and Certificate for Payment, and G703®–1992, Continuation Sheet, provide convenient and complete forms on which the contractor can apply for payment and the architect can certify that payment is due. Its use can expedite payment and reduce the possibility of error.

What are the articles in the AIA A201?

The AIA A201 is broken up into fifteen articles. They deal with all the contractual relationships, including subcontractors, as well as time, changes to the work, payments, claims, termination, and insurance and bonds. There are a few specific articles that contractors and subcontractors should be aware of when it comes to payment.

What are the general conditions of the AIA contract?

AIA Document A201–2017, General Conditions of the Contract for Construction, is considered the keystone document of the Conventional family of documents because it provides the terms and conditions under which the Owner, Contractor, and Architect will work together during the building construction process.

What happens if I terminate my AIA contract?

Note that this provision does not protect the owner if they aren’t current with their payments. According to this AIA A201 article, if the owner terminates the general contractor’s contract for their convenience, the owner shall pay the GC costs for the work completed, and termination costs, including those for terminating subcontracts.

What does the A201 do in a construction contract?

The A201 will support the terms of the contract form to establish the details of when and how payment is made, the types of insurance that will be required for the project, and will provide a process for dealing with the project during the course of construction.

Begin typing your search term above and press enter to search. Press ESC to cancel.

Back To Top