How do you finish a basement wall cheaply?

How do you finish a basement wall cheaply?

Paneling. Paneling can be used as an inexpensive way to finish you basement walls or ceiling. Use a strong adhesive to put strips of wood on your concrete basement walls, and then use wood screws that match your paneling to attach the paneling to the wood strips.

Can you frame basement walls 24 on Center?

Most basement walls us a 16″ o.c. (on center) layout. You should NEVER use a 24″ o.c. layout on your basement walls, it’s to far between wall studs and your drywall and trim may warp between the wall studs over time!

How far should studs be from basement wall?

16-inch
Be sure to maintain the 16-inch on-center stud spacing, and check the wall frame to make sure it’s plumb before nailing it to the beam.

How do you finish a concrete basement wall?

  1. Seal the Wall. Use a paint roller to apply the masonry waterproofing product you choose.
  2. Install Blocking Between Joists.
  3. Snap Lines on the Floor.
  4. Assemble the Walls on the Ground.
  5. Tip Up the Walls.
  6. Plumb the Wall and Secure the Top Plate.
  7. Build Out Around Windows.

How can I make my concrete basement walls look better?

If your concrete-block basement walls are dry and free of efflorescence or mold, you can seal them with a masonry sealer or all-purpose water-base primer-sealer and paint with a high-quality latex paint. Paint is an easy way to make the basement feel warmer, brighter, and more welcoming.

How far apart should studs be in a basement?

Wall studs spacing in your basement Basements need more support so wall studs are placed 16 inches apart from the center. At last, the bottom plate is secured properly. If you are looking for the wall studs in the basement. You should always look for a distance of 16 inches.

How do you build walls in a basement?

8 Steps to build a wall in place for your basement Line up the top and bottom plates and mark where the studs need to go, starting from the end make a mark every 16″. Nail your top plate to the ceiling joist. Plumb down to the floor and mark two points for your bottom plate.

How do you build a stud wall in a basement?

Use either the 3-4-5 or diagonal method to make sure all corners are square. Erect walls and set them plumb with a level. Fasten bottom plates to the basement floor with concrete nails. Slide a two-by-four into the 1 1/2-inch gap at the top, between the top plate and the floor joists above it.

What is wall framing?

Wall framing in house construction includes the vertical and horizontal members of exterior walls and interior partitions. These members, referred to as studs, wall plates and lintels, serve as a nailing base for all covering material and support the upper floors, ceiling and roof.