What are they building in Shepherdsville Ky?
An Atlanta developer is constructing a giant new industrial center just south of Louisville. Core5 Industrial Partners is constructing a 1,038,240-square-foot speculative building inside the Bourbon Trail Logistics Center in Shepherdsville, Ky., which is located less than a mile from Interstate 65 at Ky.
When was I-65 built?
1958
Interstate 65/Constructed
Is there a toll on I-65 in Louisville?
Three bridges connecting Louisville, Kentucky and Southern Indiana are tolled: the I-65 Lincoln and Kennedy bridges and the SR 265/KY 841 Lewis and Clark Bridge. RiverLink is all-electronic tolling, which means no slowing, no stopping and no lines.
When was i65 built in Louisville Ky?
Is I 65 in Kentucky a toll road?
Is there an exit ramp from I-65 to US 50?
I-65 N/B: exit ramp to US-50 E/B construction work. Construction work on exit ramp from I-65 Northbound at Exits 50A,50B to US-50 Eastbound.
Why are there lane closures on I-65 in Indiana?
Intermittent lane closures due to construction work on IN-39 both ways between I-65 Exit 139 and Enterprise Blvd. Temporary width limit of 18′ due to bridge maintenance work on I-65 both ways between Exit 175 IN-25 and Exit 178 IN-43.
Where is the work going on on I-65?
Work will be going on during the day and night on Monday on I-65. Erosion work will be going on from the 24.8-mile marker to the 23.7 in the center median area. The northbound direction will have the shoulder closed from the 24.8-mile marker to the 23.7-mile marker.
When is erosion work going on on I-65?
The roadway will be reduced from two lanes to one lane from 7 p.m. to 6 a.m. in this section as well. Work will be going on during the day and night on Monday on I-65. Erosion work will be going on from the 24.8-mile marker to the 23.7 in the center median area.