What is Bunker ROB?

What is Bunker ROB?

Bunker Surveys (ROB) are carried out for determining the quantity of Fuel Oil and Diesel Oil remaining on board a ship, at any time. Usually, they are required at the time of delivery to charterers or re-delivery to owners.

What is ROB in maritime?

“R.O.B.” is an abbreviation for the term “Remaining On Board”, which refers to the quantity of provisions left in your store rooms at the end of each month, or the end of a voyage, although most vessels and shipping companies will use the calendar month as the cut off point for an R.O.B.

What is Bqs report?

Bunker fuel quantity survey inspection (BQS). Reports issued for bunker quantity surveys include: A quantity delivered calculation based on density and water testing. Detailed bunker survey and analytical fuel reports. Photographs as requested and when permitted.

What is Off Hire Bunker?

Off hire survey is to check condition a vessel after hiring period and calculate quantity of fuel bunker remain on board for re-deliver to ownership (or delivery to new charterer). On/Off hires are one of nautical terms in hire of Ship / Vessel to shipping of goods from a hiring company & a leasing company.

How do you calculate bunker?

Volume(M3) = mass ( MT)/ corrected density From this you will get the total volume of bunker. Go to your sounding table go to the page of your particular tank which you are planing to take bunker, find out the volume by considering the trim. There you will get the final ullage or sounding of your tank.

What is bunker fuel used for?

Maritime vessels use bunker fuel to power their motors, but depending on your vessel, it might not be regular white diesel. Some watercraft indeed use diesel and other, larger vessels marine gas oil (which is considered a low sulfur fuel oil or LSFO) as their source of bunker fuel.

What is Rob stand for?

ROB

Acronym Definition
ROB Right on Brother
ROB Review of Business
ROB Road Over Bridge
ROB Reigns of Battlefield (video game)

What is Rob cargo?

Claims for short-landed cargo arise if an excessive residue of the cargo loaded remains on board after completion of the discharge. …

What does Offhire mean?

Off-hiring is the point at which the client has finishing using the piece of equipment they have hired, and it is ready to be collected. It is also the point the charge for hiring equipment stops.

What is time charter in shipping?

A time charter is a time-bound agreement, as opposed to a voyage charter. The shipowner leases a vessel to a charterer for a fixed period of time, and they are free to sail to any port and transport any cargo, subject to legal regulations.

How is vessel slip calculation?

Soln: Slip (percent) = Engine distance – ship’s distance/ Engine’s distance X 100. Engine distance = Pitch X RPM X 60 X 24 / 1852.

How do you take ullage?

When measuring level by ullage method, the sounding tape is inserted only till the bob/ tape touches some part of the fluid top surface. Instead of measuring the whole depth of the tank, only the free space (from the top of sounding pipe to liquid surface) is measured (Check Figure).

Begin typing your search term above and press enter to search. Press ESC to cancel.

Back To Top