What is land disturbance?
Land disturbance means any activity that changes the physical conditions of landform, vegetation and hydrology, creates bare soil, or otherwise may cause erosion or sedimentation.
Do you need a permit to clear land in Virginia?
Land disturbance is defined as any manmade change to the land surface that potentially changes its runoff characteristics including clearing, grading, or excavation. A permit is required for ALL new home construction and when the land disturbance exceeds 2,500 square feet.
How is land disturbance calculated?
Measure the square footage of each separate area of land that will be a part of your project. To find the square footage, measure the length and the width. Next, multiply the two. For example, if the length is 60 feet and the width is 30 feet, you multiply 60 x 30 for a total of 1,800 square feet.
What is a land disturbance permit in Georgia?
Generally a land disturbance permit is required when 1,000 or more square feet of ground disturbance is proposed. This can include grading, clearing, paving, grubbing, or any other activity that meets the definition of land disturbing activity under Article 9 of The City of Sandy Springs Development Code.
How long does it take to get a building permit in Virginia?
You can always check with your local permit office for current approval times. For a typical project in Fairfax County (public utilities, no RPA or Flood Zone, no full geotech report required, etc), you can expect your permit to be approved in 4 – 8 weeks.
Do I need a permit for a shed in Fairfax County?
Click HERE to view the Fairfax County Zoning Ordinance. Any shed, garage, gazebo or other structure that is larger than 256 square feet will require a building permit from the county unless it falls under the farm exemption. Building larger than 256 square feet may also require concrete footers.
What is limit disturbance?
Limits of disturbance means the boundary within which all construction, materials and equipment storage, grading, landscaping and related activities shall occur.
What is disturbed acreage?
Disturbed acres encompass an area within the total case acres and case land acres which are disturbed and affected by exploration, prospecting, development or mining operations in a Surface Management Plan or Notice.
How is land being destroyed?
Land degradation may occur through different physical, chemical and biological processes induced directly or indirectly by human activities like deforestation, shifting cultivation, overgrazing, steep slope farming, over use of chemical fertilizers and forest resources.
How much is a building permit in Virginia?
Payments. Permit Fees of $200 or less are due and payable when making application for a permit. When calculated permit fees exceed $200, the applicant is required to pay the $200 fee at the time of application. The remaining fees will be collected upon issuance of the permit.
Do I need a permit for a concrete slab in Virginia?
What construction requires a building permit in Virginia? Usually, any project that involves building a new structure, altering an existing structure, or demolishing a structure will require a permit in Virginia. This includes small structures such as decks and sheds as well as interior remodeling.
Is my land buildable?
Your local building and planning department is your best resource for determining if the land you intend to buy is buildable. Call the office, request a zoning map, and ask them for their advice about building on the property. Inquire about any rules, codes, and possible hindrances to building on the land.
What are the requirements for a land disturbance permit?
The primary requirement of a land disturbance permit is the development of a stormwater pollution prevention plan (SWPPP) that incorporates site-specific best management practices (BMPs) to minimize soil exposure, soil erosion and the discharge of pollutants.
What does it mean to be a responsible land disturber?
A responsible land disturber (RLD) is an individual holding a certificate issued by DEQ who is responsible for carrying out a land-disturbing activity in accordance with an approved erosion and sediment control (ESC) plan. The RLD must be designated on the ESC plan or permit as a prerequisite for engaging in land disturbance.
How does the land disturbing activity code work?
The Land Disturbing Activity (LDA) code regulates clearing and grading activities and is based on minimum thresholds. The thresholds outlined in code applies to the total area to be cleared for the development project.
How to report a land disturbance in Virginia?
Before beginning any land-disturbing activity, regardless of size, contact Virginia 811 at VA811.com or by telephone at 811 or 800-552-7001.